Re: Indoor facility
I thought I read when they broke ground that the facility was suppose to be completed in September 2023, but I found this article from December that indicates the facility will be completed by the end of 2023.
https://www.bozemandailychronicle.com/n ... 4fe2c.html
https://www.bozemandailychronicle.com/n ... 4fe2c.html
QB Club https://www.msubqc.org
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
-
- BobcatNation Team Captain
- Posts: 453
- Joined: Thu Oct 06, 2016 5:38 pm
Re: Indoor facility
I think it may have actually bumped back again to May of 2024. 24 months probably wasn't realistic for that magnitude of project.
- catatac
- Golden Bobcat
- Posts: 9677
- Joined: Mon Mar 29, 2004 1:37 pm
Re: Indoor facility
Where are you seeing this?4KornerKat wrote: ↑Sun Jul 02, 2023 7:02 amI think it may have actually bumped back again to May of 2024. 24 months probably wasn't realistic for that magnitude of project.
Great time to be a BOBCAT!
-
- BobcatNation Redshirt
- Posts: 43
- Joined: Mon Mar 30, 2015 2:34 pm
Re: Indoor facility
Construction of Grizzly Indoor Practice Facility stalls, affecting November target date
Bill Speltz Jun 20, 2023 Updated Jun 24, 2023
Bill Speltz Jun 20, 2023 Updated Jun 24, 2023
-
- BobcatNation Redshirt
- Posts: 43
- Joined: Mon Mar 30, 2015 2:34 pm
-
- Golden Bobcat
- Posts: 20900
- Joined: Thu Oct 23, 2008 6:16 am
- Location: An endless run of moguls
Re: Indoor facility
MSU - 16 team National Champions (most recent 2024); 57 individual National Champions (most recent 2023).
toM StUber
toM StUber
- allcat
- Golden Bobcat
- Posts: 8879
- Joined: Mon Nov 02, 2009 5:13 pm
- Location: 90 miles from Nirvana (Bobcat Stadium)
Re: Indoor facility
I can't believe you would post that name, in it's evil form, in the sanctified annals of the BOBCAT football forum. At least edit for the correct version of gris.
Geezer. Part Bionic,. Part Iconic
-
- BobcatNation Team Captain
- Posts: 453
- Joined: Thu Oct 06, 2016 5:38 pm
Re: Indoor facility
I heard it through the grapevine?catatac wrote: ↑Sun Jul 02, 2023 11:41 amWhere are you seeing this?4KornerKat wrote: ↑Sun Jul 02, 2023 7:02 amI think it may have actually bumped back again to May of 2024. 24 months probably wasn't realistic for that magnitude of project.
- vike_king
- BobcatNation Hall of Famer
- Posts: 3259
- Joined: Fri Oct 07, 2005 12:51 pm
- Location: Helena, MT/Chester, MT/Fort Benton, MT
Re: Indoor facility
Dang it, too late again!!
Chester, MT/ Helena, MT
-
- Golden Bobcat
- Posts: 20900
- Joined: Thu Oct 23, 2008 6:16 am
- Location: An endless run of moguls
Re: Indoor facility
A poorly thought out post on my part.

MSU - 16 team National Champions (most recent 2024); 57 individual National Champions (most recent 2023).
toM StUber
toM StUber
- AFCAT
- Golden Bobcat
- Posts: 12979
- Joined: Mon Sep 12, 2016 3:25 pm
Re: Indoor facility
Took a few photos on Saturday of the fitness center progress. They still have a long way to go.










QB Club https://www.msubqc.org
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
- RICO CAT
- Honorable Mention All-BobcatNation
- Posts: 760
- Joined: Fri Apr 16, 2021 2:36 pm
Re: Indoor facility
Wow, that looks great, really like all the windows. Thanks for the update AFCAT.
“OVER THEM MOUNTAINS”
- RickRund
- Golden Bobcat
- Posts: 8064
- Joined: Tue Jun 22, 2010 6:08 pm
- Location: Post Falls ID
Re: Indoor facility
Any timeline?
msubobcats@outlook.com
Audiatur et altura pars: Let both sides be fairly heard.
Audi alteram partem: listen to the other side.
Audiatur et altura pars: Let both sides be fairly heard.
Audi alteram partem: listen to the other side.
-
- Golden Bobcat
- Posts: 20900
- Joined: Thu Oct 23, 2008 6:16 am
- Location: An endless run of moguls
Re: Indoor facility
SDSU has a nice fitness center on campus that is open to public. I used it for $10. Is MSU going to allow it to be used by the public?
MSU - 16 team National Champions (most recent 2024); 57 individual National Champions (most recent 2023).
toM StUber
toM StUber
- snarf
- BobcatNation Letterman
- Posts: 147
- Joined: Fri Nov 09, 2012 9:17 am
Re: Indoor facility
General public, no, unless they are there with a member. Alumni yes. https://www.montana.edu/campusrec/membe ... bpage.html
Interestingly, there is a specific Montana law that covers this so university fitness centers are not in competition with local, private businesses.
https://leg.mt.gov/bills/2001/billhtml/SB0151.htm
-
- BobcatNation Letterman
- Posts: 199
- Joined: Fri Apr 02, 2004 2:35 pm
- Location: Bozeman
Re: Indoor facility
RFQ out for the indoor facility, $15M budget with a spring start date and winter 2024/25 completion.
The Indoor Practice Facility project at Montana State University in Bozeman, MT is a new “ground up" athletic facility located immediately southwest of the existing Bobcat Stadium, and north of existing irrigation pond facility. The site is on an existing parking lot and landscaping yard. The primary structure will be a pre-engineered, metal framed, tensioned fabric exterior building, which houses a 100 yard (two 10 YD endzones with 80 YD striped field between) artificial turf football field. Attached to the metal building will be a stick-built support building that will include entry lobby, restrooms, changing areas, storage, and mechanical space. The project also includes site improvements to the immediate surrounding site, including the landscape area around the building and a small parking area for the required ADA parking. A fire lane may need to be required along the south elevation. The rest of the parking will be part of another project adjacent to the main stadium, not in this scope but will have to be coordinated with other engineering firms.
The Indoor Practice Facility project at Montana State University in Bozeman, MT is a new “ground up" athletic facility located immediately southwest of the existing Bobcat Stadium, and north of existing irrigation pond facility. The site is on an existing parking lot and landscaping yard. The primary structure will be a pre-engineered, metal framed, tensioned fabric exterior building, which houses a 100 yard (two 10 YD endzones with 80 YD striped field between) artificial turf football field. Attached to the metal building will be a stick-built support building that will include entry lobby, restrooms, changing areas, storage, and mechanical space. The project also includes site improvements to the immediate surrounding site, including the landscape area around the building and a small parking area for the required ADA parking. A fire lane may need to be required along the south elevation. The rest of the parking will be part of another project adjacent to the main stadium, not in this scope but will have to be coordinated with other engineering firms.
-
- BobcatNation Letterman
- Posts: 158
- Joined: Sat Mar 10, 2007 8:45 pm
Re: Indoor facility
From this description, there are no plans to put a track around the outside to accommodate the T&F program. Curious to know if there was ever an additional cost estimate to include the track and it was then decided that the final cost would be more than could be afforded.CATCO wrote: ↑Mon Sep 18, 2023 2:41 pmRFQ out for the indoor facility, $15M budget with a spring start date and winter 2024/25 completion.
The Indoor Practice Facility project at Montana State University in Bozeman, MT is a new “ground up" athletic facility located immediately southwest of the existing Bobcat Stadium, and north of existing irrigation pond facility. The site is on an existing parking lot and landscaping yard. The primary structure will be a pre-engineered, metal framed, tensioned fabric exterior building, which houses a 100 yard (two 10 YD endzones with 80 YD striped field between) artificial turf football field. Attached to the metal building will be a stick-built support building that will include entry lobby, restrooms, changing areas, storage, and mechanical space. The project also includes site improvements to the immediate surrounding site, including the landscape area around the building and a small parking area for the required ADA parking. A fire lane may need to be required along the south elevation. The rest of the parking will be part of another project adjacent to the main stadium, not in this scope but will have to be coordinated with other engineering firms.
- AFCAT
- Golden Bobcat
- Posts: 12979
- Joined: Mon Sep 12, 2016 3:25 pm
Re: Indoor facility
I’m sure there was an estimate and that might be part of the reason this project has been delayed. I know I’d love to see track have a true indoor facility like the one envisioned in the master plan.msutrackfan wrote: ↑Fri Sep 22, 2023 12:09 pmFrom this description, there are no plans to put a track around the outside to accommodate the T&F program. Curious to know if there was ever an additional cost estimate to include the track and it was then decided that the final cost would be more than could be afforded.CATCO wrote: ↑Mon Sep 18, 2023 2:41 pmRFQ out for the indoor facility, $15M budget with a spring start date and winter 2024/25 completion.
The Indoor Practice Facility project at Montana State University in Bozeman, MT is a new “ground up" athletic facility located immediately southwest of the existing Bobcat Stadium, and north of existing irrigation pond facility. The site is on an existing parking lot and landscaping yard. The primary structure will be a pre-engineered, metal framed, tensioned fabric exterior building, which houses a 100 yard (two 10 YD endzones with 80 YD striped field between) artificial turf football field. Attached to the metal building will be a stick-built support building that will include entry lobby, restrooms, changing areas, storage, and mechanical space. The project also includes site improvements to the immediate surrounding site, including the landscape area around the building and a small parking area for the required ADA parking. A fire lane may need to be required along the south elevation. The rest of the parking will be part of another project adjacent to the main stadium, not in this scope but will have to be coordinated with other engineering firms.
QB Club https://www.msubqc.org
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
Bobcat Collective https://bobcatcollective.com/
Bobcat athletics is a business to the coaches, school leadership, and players. It's time the fans treat Bobcat athletics as a business too.
- kmax
- Site Admin
- Posts: 9783
- Joined: Sat Mar 06, 2004 6:23 pm
- Location: Belgrade, MT
- Contact:
Re: Indoor facility
We were told that it was considered but the costs of something like was in the original master plan was just way too much with the increases in building costs since that plan was put out. Waiting to fund that type of facility would have meant years to decades before getting an indoor facility most likely.AFCAT wrote: ↑Fri Sep 22, 2023 12:32 pmI’m sure there was an estimate and that might be part of the reason this project has been delayed. I know I’d love to see track have a true indoor facility like the one envisioned in the master plan.msutrackfan wrote: ↑Fri Sep 22, 2023 12:09 pmFrom this description, there are no plans to put a track around the outside to accommodate the T&F program. Curious to know if there was ever an additional cost estimate to include the track and it was then decided that the final cost would be more than could be afforded.CATCO wrote: ↑Mon Sep 18, 2023 2:41 pmRFQ out for the indoor facility, $15M budget with a spring start date and winter 2024/25 completion.
The Indoor Practice Facility project at Montana State University in Bozeman, MT is a new “ground up" athletic facility located immediately southwest of the existing Bobcat Stadium, and north of existing irrigation pond facility. The site is on an existing parking lot and landscaping yard. The primary structure will be a pre-engineered, metal framed, tensioned fabric exterior building, which houses a 100 yard (two 10 YD endzones with 80 YD striped field between) artificial turf football field. Attached to the metal building will be a stick-built support building that will include entry lobby, restrooms, changing areas, storage, and mechanical space. The project also includes site improvements to the immediate surrounding site, including the landscape area around the building and a small parking area for the required ADA parking. A fire lane may need to be required along the south elevation. The rest of the parking will be part of another project adjacent to the main stadium, not in this scope but will have to be coordinated with other engineering firms.
“Arguing with anonymous strangers on the Internet is a sucker's game because they almost always turn out to be—or to be indistinguishable from—self-righteous sixteen-year-olds possessing infinite amounts of free time.” -- Neal Stephenson, Cryptonomicon
- DMMDCats
- 2nd Team All-BobcatNation
- Posts: 1230
- Joined: Sat Aug 25, 2018 5:21 pm
- Location: in a very unimportant part of the galaxy
- Contact:
Re: Indoor facility
Calling Nick…
Calling Sir Nick…
Bring your Dubai buddy and donate a bldg or 3.
Calling Sir Nick…
Bring your Dubai buddy and donate a bldg or 3.
It don’t matter